Testimonials
“Byrne Looby Partners have designed the piled foundations and retaining walls for the top-down deep basement at the Shard, London Bridge, providing timely and economic solutions, expediting approval by Network Rail’s professional team and enabling the piling works to progress on programme.” Mark Pennington – Major Projects Design Manager – Stent Foundations Limited
“BLP have carried out a buildability assessment, earthworks design, steepened slope design, retaining structure design and temporary works design on the M50 Phase 2 PPP Motorway Project in Dublin in a satisfactory and technically efficient manner” – Francisco Martin De Santa Olalla – Project Chief Engineer – FCC
“BLP delivered cost-effective engineered solutions on time and to the highest technical standards on the design of permanent steepened earthworks, earth retaining structures and temporary excavation assessments and inspections on our large M50 project.” Martin Maher – Director – Siac-Ferrovial
“From design to project management, BLP’s completed to our total satisfaction all works on the lansdowne road stadium foundation such as railway design submissions for piling activities and geotechnical/demolition works next to the rail corridor.” Pat Molloy – Senior Project Manager – Project Management Ltd
“The level of expertise and commitment that BLP’s consulting engineers brought to our project was invaluable, with their in-depth knowledge of geotechnical solutions contributing to keeping our project on target” Frank Quirk – Director – John Sisk & Son Ltd
|